16 Newest Free jQuery Plugins For This Week
Here's our #61 hand-picked collection of 16 New Free jQuery Plugins with examples we found around the web from last week (09/01/2015-15/01/2015). These jQuery plugins haven't been featured on our website yet I think you might find useful. Have fun with it and remember to spread the word!
jQuery Custom Select Option
jQuery Curved Cut
Aa layout idea with a curved cut header image.
jQuery Colors plugin
This plugin can be used to randomly apply colors to divs using jQuery.
jQuery Gantt-style Timeline
Gantt-style project timeline. Built with vanilla CSS and HTML with some jQuery for DOM manipulation.
jQuery geoInput
Geolocation input type for html forms. jQuery plugin. Requires on Google Maps v3 API and, for reverse geocoding, an API key.
jQuery Markdown Extra Live Toolbox
A JQuery plugin that adds Markdown Extra live previews, and a toolbar for common markdown editions.
jQuery LazyLoadSpin
jQuery LazyLoad + spin.js
jQuery CarouselSS
CarouselSS, pronounced "carousel s-s", is jQuery Carousel plugin for HTML content/images. It listens to CSS transition/animation events when switching frames and uses CSS class-based states.
jQuery Vj Accordion Steps
jQuery Accordion Steps with Individual Steps Validation and Optional Reset Steps in final step
jQuery jsPanel
A jsPanel can be used as a floating, draggable and resizable panel, as modal, as tooltip and even as a hint. Configuration options include additional toolbars for header and/or footer sections, support for right-to-left text direction, built in bootstrap support, 13 themes and much more.
jquery jsNoteEditor
This plugin adds a simple music note editor onto your web page.
jquery rateit
Fast, Progressive enhancement, touch support, customizable (just swap out the images, or change some CSS), Unobtrusive JavaScript (using HTML5 data-* attributes), RTL support, ARIA & keyboard support. Use as many stars as you'd like, and also any step size.
jquery codex
jQuery Plugin for sodomizing texts for a given time.
jquery scrolling-text
A simple jQuery plugin which makes your text scroll-able so you can save valuable space on your web page.
jquery image-slide-with-single-img
Nice image slide animation with a single img, animate css and a little jQuery :)
Making a Shoutbox with PHP and jQuery
In this tutorial, we are going to build a shout box with PHP and jQuery, which allows visitors of your website to leave short comments to one another.





















